C724 Information Systems Management, catalog number BUIT 3000, is the three-CU information systems course in the WGU School of Business. Its catalog scope covers the facets of business information systems and treating information technology as an organisational resource to be managed. The framing is the whole course: this is a management subject that happens to be about technology, not a technology subject that happens to mention management, and answering it from the wrong side is the most common way students lose aspects.

C724 grading scale at WGU, how the work is graded, from WGU Tutors
How WGU grades C724, visualized by WGU Tutors.

IT as a resource, judged like any other investment

The central move in BUIT 3000 is treating information technology the way a manager treats any other resource: something that costs money, carries risk, requires people, and has to justify itself against a business objective. Students from technical backgrounds tend to write about capability, describing what a system can do. Students from business backgrounds tend to write about strategy in the abstract, without engaging what the technology actually is. The course wants the join between them.

That join shows most clearly in how a system is evaluated. The right questions are not whether a technology is modern or well regarded. They are which business process it changes, what that change is worth, what it costs across its whole life rather than at purchase, who has to change their working practices for it to succeed, and what happens if it fails. A recommendation built from those questions reads as management. A recommendation built from feature lists reads as a brochure.

Alignment is the vocabulary the course keeps returning to. An information system earns its place when it supports something the organisation is actually trying to do, and misalignment is the diagnosis behind a surprising share of expensive failures: systems that automate a process nobody needed, or that solve a problem in one department while creating one in two others. A submission that can name the objective, name the system and show the connection between them has done the central work of the course.

Three other themes run through the course and appear regularly in assessed work. Data as an asset, meaning that information has value, ownership, quality requirements and a lifecycle. Risk and security as a management responsibility rather than a technical department's problem. And the human side of implementation, since the reason information systems projects fail is usually organisational rather than technical, and a submission that never mentions people is describing half the problem.

Turning scored aspects into a section plan

WGU keeps the scoring detail inside your Course of Study rather than in the public catalog, so open it before planning. School of Business courses may be measured by a submitted performance assessment, by a proctored objective assessment, or by both, and a written business deliverable and a timed assessment call for very different weeks.

Under a performance assessment, each scored aspect is judged on its own against a three-point scale and a score of 2 in every aspect passes the task. Nothing averages, so a well-argued recommendation cannot rescue a risk aspect that was never addressed. Give each aspect its own heading using the rubric's own noun, and the evaluator scores by reading rather than searching.

The word budget, worked. Suppose six scored aspects and directions asking for roughly 2,000 words. Reserve 160 for a framing that names the organisation and the decision, and 140 for a recommendation close, leaving 1,700 across six aspects, about 283 words each. Then rebalance toward the two aspects that carry the most weight in business writing: the analysis that connects the technology to a business outcome, and the recommendation itself. Take 40 words from each descriptive aspect and give 120 to each of those two.

Write the recommendation first, in draft, then build the analysis that supports it. Business deliverables written in the other order tend to arrive at a conclusion the evidence does not quite reach.

A structure that fits an information systems deliverable

Task directions govern where they set a format. Where they leave room, this arrangement matches how information systems work is written for a decision maker.

SectionWhat belongs in itHow it gets scored
Business contextThe organisation, the process at issue and the decision on the tableFrames everything; a submission with no named decision cannot be evaluated
System descriptionWhat the information system does, in terms of the process it supportsScored for relevance rather than for technical depth
Value analysisThe business outcome affected, quantified where possible, against total costThe central scored section and the one technical answers skip
Data considerationsWhat information the system holds, its quality requirements and its ownershipScored where data as an asset is named
Risk and securityThe specific risks, their likelihood and impact, and the controls proposedScored for management framing rather than for a list of threats
People and changeWho has to work differently and how that change will be supportedScored where implementation is named and routinely omitted in drafts
RecommendationA specific action with an owner, a timeframe and the measure that would show it workedScored for being decidable; hedged recommendations read as unmet

Quantify wherever the task allows it. Hours saved, error rates, cycle times and licence costs turn an assertion that a system would help into an argument a manager could act on, and that difference is what most business rubrics are built to detect.

Evidence craft in business technology writing

Information systems writing draws on vendor material, industry commentary and academic work, and the three deserve very different levels of trust.

  • Treat vendor sources as claims rather than findings. Citing them is fine; presenting marketing material as evidence is not.
  • Prefer peer-reviewed or established industry research for claims about outcomes, and cite it in APA.
  • Quantify with real figures where the task supplies them, and label anything you estimate as an estimate with the basis stated.
  • Name the organisation and the timeframe for every claim about performance, since context is what makes a business number meaningful.
  • Distinguish what the technology does from what the organisation would have to do for it to work, and evidence both separately.
  • Keep quotation minimal; definitions of standard information systems concepts are heavily reproduced and WGU runs submissions through a similarity check.

The habit that most improves these submissions is naming the condition under which your recommendation would be wrong. Saying that the case rests on a stated transaction volume, and that below it the investment would not return, demonstrates judgement and pre-empts the obvious objection.

What separates Competent from a return

Work is recorded as Competent or Not Competent, with no letter grades and no ordinary grade point average. Because each aspect is scored on its own, business submissions typically return for one or two named sections rather than as a whole.

  • Every scored aspect has a heading using the rubric's own wording.
  • Every technical description is tied to the business process it affects.
  • Every value claim carries a number or a clearly labelled estimate.
  • Every risk names a likelihood, an impact and a control.
  • Every recommendation is specific enough that a manager could refuse it.

Performance assessment work can be revised and resubmitted with no grade penalty, so a return costs calendar rather than standing. Terms run six months at a flat rate, which means the number of courses you close inside a term is what actually determines your cost per course, and a three-CU business course held open by a missing risk section is an easy loss to avoid.

Where C724 carries a proctored objective assessment, the boundary is absolute. Proctored assessments are yours to sit. We prepare with concept review, drilled frameworks, practice questions and an honest readiness verdict. We do not sit assessments and we never ask for portal credentials.

Six mistakes students make in C724

  • Writing as a technologist. Capability descriptions with no business outcome attached are the classic thin submission in this course.
  • Writing as a strategist with no system. The opposite failure, and just as visible: abstract strategy that never engages what the technology actually does.
  • Costing at purchase price. Licences, training, integration, support and eventual replacement are all part of what a system costs an organisation.
  • Listing threats instead of managing risk. Likelihood, impact and control are what turn a threat list into risk management.
  • Ignoring the people. Information systems projects fail organisationally far more often than technically, and a submission silent on change is incomplete.
  • Hedging the recommendation. A recommendation nobody could disagree with is not a recommendation, and rubrics read it as unmet.

How support works on this course

Send your Course of Study for C724 with any rubric and task directions. What comes back is a framing check that moves your draft from capability description to business argument, a value analysis with total cost rather than purchase price, a risk section written with likelihood, impact and control, and an aspect-mapped draft ending in a recommendation specific enough to be acted on or refused.

C724 sits in the middle of most business plans and it teaches a pattern the rest of the degree keeps reusing: connect a capability to an outcome, quantify it, name the risk, and recommend something decidable. Getting that pattern here makes the later courses noticeably faster.

Questions students ask about C724

Is C724 the same course as BUIT 3000?
Yes. C724 is the WGU course code and BUIT 3000 is the catalog number for the same three-CU course, Information Systems Management, in the School of Business. Both identifiers appear in the catalog and on your Degree Plan.
Do I need a technical background for C724?
No. The catalog scope for BUIT 3000 covers the facets of business information systems and treating IT as an organisational resource to be managed. The assessed skill is management reasoning about technology: what a system changes in a business process, what it costs across its life, what it risks and who has to work differently. Technical depth beyond that is rarely what earns an aspect.
Can you take a proctored assessment for me?
No. Objective assessments at WGU are proctored, so our support is preparation only: concept review, drilled frameworks, practice questions and an honest readiness call. We never sit assessments and never ask for portal credentials.

Writing about the technology instead of the decision?

Send your Course of Study and any rubric. You get a business framing check, a total-cost value analysis, a proper risk section, and aspect-mapped drafting.

Where C724 sits in WGU's programs

The July 2026 catalog places this code in 1 current WGU program. Open a program page for the complete standard path and term positions. The live Degree Plan remains authoritative after transfer credit, substitutions, and mentor planning.

The assessments, one by one

The public catalog does not publish this course's PA/OA identity or task count. WGU Tutors publishes at most one PA manual per course and only from a WGU-controlled public rubric. Until that source exists, PA help begins from the student's real Course of Study and OA support remains preparation only.